The Hilla Power Station project was one of the most complex communication infrastructure deployments Digital Eye has undertaken. Serving a 750 MW generation facility operated by Iraq's Ministry of Electricity, the project required a complete overhaul of all communication, surveillance, and data networking systems across a sprawling multi-building industrial campus.
The Challenge
The existing infrastructure was outdated, fragmented, and unable to support the operational demands of a modern power generation facility. Communication between control rooms, maintenance teams, and administrative offices was unreliable, and the security surveillance system had significant blind spots across the 45-hectare site.
Our Solution
Digital Eye deployed a fully integrated IP telephony backbone using Grandstream UCM PBX systems, connected via a redundant fiber optic ring topology. A new IP CCTV system with 180+ cameras was installed across all critical zones, integrated with a central monitoring station. The data network was rebuilt from the ground up using enterprise-grade switching and routing infrastructure.
The Outcome
The project was delivered on time and within budget, resulting in a 94% improvement in internal communication reliability, full surveillance coverage across all critical zones, and a unified network infrastructure that now serves as the backbone for the facility's digital transformation roadmap.
Systems Implemented
What We Deployed
IP Telephony
PBX Systems
CCTV & Surveillance
Technologies Used
Key Technologies
Grandstream UCM6308
Cisco Catalyst Switches
Hikvision IP CCTV